Login as administrator: admin@consul.dev, password: 12345678 | Login as verified user: verified@consul.dev, password: 12345678
Go back

Comprehensive reform of roads, sidewalks and tunnels

Henry Hall Henry Hall  •  2021-09-16  •  North district  • 

Investment project code: 9

Integral reform of roads and sidewalks, and Repair, painting and asphalt of tunnels


You must sign in or sign up to leave a comment.
    Don't have defined milestones